US 41 Venice Bypass Project Schedule
   
ACTIVITIES SUMMER 2005 FALL
2005
WINTER
2005/2006
SPRING 2006 SUMMER 2006 FALL
2006
WINTER
2006/2007
SUMMER 2008
     
Study Begins      
     
Engineering Analysis      
   
   
Public Meeting      
       
Engineering Studies        
   
   
Public Hearing      
       
PD&E Documents        
     
Study Ends        
     
Design Phase